Cursor App Template #12 — Gantt Charts & Timelines
Gantt Charts & Timelines
Interactive Gantt planner with dependencies, critical path, and Excel export.
Overview
This single-page app helps project managers build and visualize task schedules. AG-Grid lists every task with dates, duration, progress, dependencies, and resource assignment. A CSS Gantt chart shows bars on a week or month timeline — drag the right edge of a bar to resize its end date. Alpine.js powers the add-task form and timeline controls.
Key features
Task grid
- Columns: ID, Task, Start, End, Duration, Progress, Dependencies, Resource
- Nine sample tasks including milestones for a software rollout plan
- Progress bar cell renderer for completion percentage
- Critical-path rows bolded when highlight is enabled
Visual Gantt chart
- CSS timeline with week or month scale toggle
- Colored bars sized to start/end dates; progress overlay on each bar
- Drag-to-resize on bar right edge updates end date and duration
- Milestone markers shown as diamond shapes on the timeline
- Critical path tasks highlighted in red when toggle is on
Dependencies & milestones
- Dependencies stored as comma-separated task IDs (e.g. `2, 5`)
- Milestone checkbox creates zero-duration markers
- Critical path simulated by walking longest dependency chains
Add task form
- Alpine.js form: name, dates, progress slider, dependencies, resource, milestone flag
Timeline controls
- Weeks / Months scale buttons rebuild header ticks
- Highlight critical path checkbox tints critical tasks and bars
- Excel export and import via SheetJS
Summary dashboard
- Total tasks, milestones, average progress, critical path count, plan duration (days)
Persistence & theme
- Tasks saved in `localStorage` (`ganttCharts_v1`)
- Dark mode toggle with saved preference
- Reset plan restores sample tasks
Data & persistence
- Sample plan: kickoff → requirements → design → development → testing → go-live
- Storage key: `ganttCharts_v1` for tasks; `ganttCharts_dark` for theme
- Import replaces the full plan after confirmation
Charts & reporting
- Summary KPI cards (not Chart.js — numeric dashboard)
- Excel export includes all task fields for stakeholder reports
Built with
Tailwind CSS, AG-Grid Community, Alpine.js, and SheetJS — all from CDN in one HTML file.
Try the interactive walkthrough below. Click Walk through features and use Next / Back (or arrow keys) to explore every feature.
Gantt Charts — Complete app
Gantt Charts & Timelines
Plan tasks, dependencies, and critical path.
Tasks9
Milestones3
Avg %43%
Critical5
Days77
Add task
TaskMar — May 2026
Kickoff
Requirements
UI/UX design
Backend dev
| Task | Start | End | Dur | Progress | Deps | Resource |
|---|---|---|---|---|---|---|
| Requirements | 03-02 | 03-14 | 12d | 100% | 1 | Analysts |
| UI/UX design | 03-10 | 03-28 | 18d | 80% | 2 | Design |
| Backend dev | 03-15 | 04-18 | 34d | 55% | 2 | Engineering |
💾 Plan persists in localStorage.